<?xml version="1.0"?>
<oembed><version>1.0</version><provider_name>M&#xE1;quina de reciclaje de pl&#xE1;stico, M&#xE1;quina de reciclaje de pel&#xED;culas, M&#xE1;quina de reciclaje de botellas de PET, Pelletizadora de pl&#xE1;stico, Equipo de reducci&#xF3;n a pulpa</provider_name><provider_url>https://www.beierrecycling.com/es</provider_url><title>Plastic pelletizer operating rules - Plastic Recycling Machine, Film Recycling Machine, Pet Bottle Recycling Machine, Plastic Pelletizer,Pulping Equipment</title><type>rich</type><width>600</width><height>338</height><html>&lt;blockquote class="wp-embedded-content" data-secret="ZX4u8E5n05"&gt;&lt;a href="https://www.beierrecycling.com/es/plastic-pelletizer-operating-rules/"&gt;Normas de funcionamiento de la peletizadora de pl&#xE1;stico&lt;/a&gt;&lt;/blockquote&gt;&lt;iframe sandbox="allow-scripts" security="restricted" src="https://www.beierrecycling.com/es/plastic-pelletizer-operating-rules/embed/#?secret=ZX4u8E5n05" width="600" height="338" title="&#x201C;Plastic pelletizer operating rules&#x201D; &#x2014; Plastic Recycling Machine, Film Recycling Machine, Pet Bottle Recycling Machine, Plastic Pelletizer,Pulping Equipment" data-secret="ZX4u8E5n05" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"&gt;&lt;/iframe&gt;&lt;script&gt;
/*! This file is auto-generated */
!function(d,l){"use strict";l.querySelector&amp;&amp;d.addEventListener&amp;&amp;"undefined"!=typeof URL&amp;&amp;(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&amp;&amp;!/[^a-zA-Z0-9]/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),o=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),c=new RegExp("^https?:$","i"),i=0;i&lt;o.length;i++)o[i].style.display="none";for(i=0;i&lt;a.length;i++)s=a[i],e.source===s.contentWindow&amp;&amp;(s.removeAttribute("style"),"height"===t.message?(1e3&lt;(r=parseInt(t.value,10))?r=1e3:~~r&lt;200&amp;&amp;(r=200),s.height=r):"link"===t.message&amp;&amp;(r=new URL(s.getAttribute("src")),n=new URL(t.value),c.test(n.protocol))&amp;&amp;n.host===r.host&amp;&amp;l.activeElement===s&amp;&amp;(d.top.location.href=t.value))}},d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",function(){for(var e,t,s=l.querySelectorAll("iframe.wp-embedded-content"),r=0;r&lt;s.length;r++)(t=(e=s[r]).getAttribute("data-secret"))||(t=Math.random().toString(36).substring(2,12),e.src+="#?secret="+t,e.setAttribute("data-secret",t)),e.contentWindow.postMessage({message:"ready",secret:t},"*")},!1)))}(window,document);
//# sourceURL=https://www.beierrecycling.com/wp-includes/js/wp-embed.min.js
&lt;/script&gt;</html><thumbnail_url>https://www.beierrecycling.com/wp-content/uploads/2017/02/11-43.jpg</thumbnail_url><thumbnail_width>400</thumbnail_width><thumbnail_height>333</thumbnail_height><description>First, the purpose Standardized equipment operation and plastic pelletizer maintenance, the purpose is to ensure the normal operation of equipment and extend the life, reduce maintenance costs and improve production efficiency. Second, the scope of application Applicable to the company&#x2019;s production of TPR / EVA / PVC / Color Masterbatch / no halogen cable / rubber high-filled engineering materials and other production line equipment operating instructions. Third, the special duties The equipment designated by the use of units of special operators and maintenance personnel shall not be illegal operation, and must be skilled in the operation of equipment, to supervise the unrelated personnel shall not be close to and tamper with the damage to the equipment duties. Fourth, the operating rules &#x2488; turn on the power, set the temperature and pay attention to whether the normal heating. &#x2489; clean the hopper and other units, out of the water pipe, check the gear oil, oil, high temperature butter oil level and lubrication state, the new machine gear oil replacement at least six months, the activities of the site at least once a week to add oil. &#x248A; temperature is close to set the temperature, prepare the material and start the main...</description></oembed>
